AWS Collection home page

Browse
Subscribe to this collection to receive daily e-mail notification of new additions RSS Feed
Collection's Items (Sorted by Submit Date in Descending order): 1 to 20 of 322
 more >
PreviewIssue DateTitleContributor(s)
YYLEUAAAAAAAAAAA.pdf.jpg2001Standard Welding Procedure Specification (WPS) for Gas Tungsten Arc Welding with Consumable Insert Root Followed by Shielded Metal Arc Welding of Carbon Steel (M-1/P-1/S- 1, Group 1 or 2), 1/8 Through 1-1/2 Inch Thick INMs-1, ER70S-2, and E7018, As-Welded-
YYPIJBAAAAAAAAAA.pdf.jpg2006Specification for the Qualification of Plastics Welding Inspectors for Hot Gas, Hot Gas Extrusion, and Heated Tool Butt Thermoplastic Welds-
YXUBJBAAAAAAAAAA.pdf.jpg2006Standard Welding Procedure Specification (SWPS) for Argon plus 25% Carbon Dioxide Shielded Flux Cored Arc Welding of Carbon Steel (M-1/P-1/S-1, Groups 1 and 2), 1/8 through 1-1/2 inch Thick, E7XT-X, As-Welded or PWHT Condition, Primarily Pipe Applications-
YYINABAAAAAAAAAA.pdf.jpg2002Guide for Thermal-Spray Operator Qualification-
YBMJTAAAAAAAAAAA.pdf.jpg2001Metric Practice Guide for the Welding Industry-
ZGWABFAAAAAAAAAA.pdf.jpg2013Specification for Resistance Welding for Aerospace Applications. - 2nd Edition-
YXLAIEAAAAAAAAAA.pdf.jpg2010Materials and Applications Part 1-
XVTSXBAAAAAAAAAA.pdf.jpg2005Specification for Low-Alloy Steel Electrodes and Rods for Gas Shielded Arc Welding - Third Edition; Incorporating Errata: February 2007-
1999Professional´s Advisor on Welding Stainless Steels-
2004The Everyday Pocket Handbook for Visual Inspection of AWS D1.1 Structural Welding Code´s Fabtication and Welding Requirements-
2013Recommended Practices for Electron Beam Welding and Allied Processes-
1999The Practical Reference Guide for Welding Titanium-
2001Mechanized, Automated, and Robotic Welding-
2007Standard Welding Procedure Specification (WPS) for Shielded Metal Arc Welding of Carbon Steel (M-1/P-1/S-1, Group 1 or 2), 1/8 Through 1-1/2 Inch Thick, E6010 (Vertical Downhill) Followed by E7018 (Vertical Uphill), As-Welded or PWHT Condition, Primarily-
2013Specification for the Qualification of Welding Inspectors - 2nd Edition-
2011Specification for Torch Soldering - First Edition-
2001Test Methods for Evaluating Welded Joints-
2001Standard Welding Procedure Specification (SWPS) for Gas Tungsten Arc Welding followed by Shielded Metal Arc Welding of Austenitic Stainless Steel (M-8/P-8/S-8, Group 1), 1/8 through 1-1/2 inch Thick, ER3XX and E3XX-XX, As-Welded Condition, Primarily Pipe-
1999Design and Planning Manual for Cost-Effective Welding-
2009Standard Welding Procedure Specification (SWPS) for Gas Tungsten Arc Welding of Chromium-Molybdenum Steel (M-5A/P-5A), ER90S-B3, 1/8 through 1/2 in. Thick, As-Welded Condition; 1/8 through 3/4 in. Thick, PWHT Condition, Primarily Pipe Applications Site Li-
Collection's Items (Sorted by Submit Date in Descending order): 1 to 20 of 322
 more >

Discover & Search